合肥生活安徽新聞合肥交通合肥房產生活服務合肥教育合肥招聘合肥旅游文化藝術合肥美食合肥地圖合肥社保合肥醫院企業服務合肥法律

        代寫MATH6119、Python/c++編程語言代做

        時間:2024-05-15  來源:合肥網hfw.cc  作者:hfw.cc 我要糾錯



        Case Study - Information Sheet
        Printed Circuit Board Assembly
        1 Background
        Philips Electronics produces printed circuit boards (PCBs) for use in consumer electronics (audio and video equipment, personal computers) and in professional industries
        (telecommunication systems, aircraft navigation, medical equipment). Special machines
        are used to mount components onto the boards. The problem to be considered is one
        of production preparation: for each type of PCB, it is necessary to specify the way in
        which the components should be mounted.
        This case study is based on work carried out for one of the major product divisions
        of Philips. Although some simplifications have been made to the original problem, this
        does not affect the main characteristics of the decisions that have to be taken.
        2 Assembly of PCBs
        PCBs are assembled by automated machines. A conveyor feeds each board into the first
        machine, and transports the boards between machines. Thus, a board passes into the
        first machine where a selected subset of components are mounted, then passes to the
        second machine where further component mountings are performed, and so on, until the
        last machine completes the PCB. The conveyor moves all partially assembled boards to
        the next machine simultaneously. Thus, the conveyor only moves when every machine
        has completed its work on a board. For example, if there are eleven components to be
        mounted by three machines, A, B and C, where machine A mounts components 1, 2,
        3 and 4 and takes 8 seconds, machine B mounts components 5, 6 and 7 and takes 12
        seconds, and machine C mounts components 8, 9, 10 and 11 and takes 9 seconds, then the
        conveyor moves the boards every 12 seconds. Consequently, the first PCB is completed
        after 36 seconds, and a further PCB is completed at the end of each subsequent 12-second
        interval.
        The components to be mounted on the board are contained in feeders on one side of
        the conveyor. The components are classified into different types, and each feeder only
        contains components of a single type.
        Each machine has a robot arm with three heads. The heads are each fitted with a
        piece of equipment which can pick components from the feeders and subsequently place
        them on the board. At most one component at a time can be carried by a head. Note that
        each component type can only be handled by a subset of the set of head equipments. In
        other words, a head with a given piece of equipment can only pick and place components
        of a limited set of component types.
        The mounting process consists of a sequence of pick-and-place moves. In the picking
        phase, the heads pick a component from the relevant feeders in turn. The order is
        fixed: the first head picks first, then the second, and finally the third head. During
        1
        the placing phase, the robot arm moves to appropriate points on the board so that
        the components can be sequentially mounted. In contrast to the picking, the order in
        which the components are mounted can be chosen. Note that it is possible to choose
        pick-and-place moves in which only one or two of the three heads are used.
        To illustrate the process, consider the following example in which a single machine is
        used to mount five components on a board. There are two components of type α, one of
        type β, and two of type γ. The feeders for these component types have coordinates (5,
        0), (10, 0), and (15, 0), respectively. Further, the two α components have to be mounted
        at locations with coordinates a1 = (10, 2) and a2 = (10, 12), the β component has to
        be mounted at a location with coordinates b1 = (6, 5), and the two γ components have
        to be mounted at locations with coordinates c1 = (15, 8) and c2 = (14, 16). Suppose
        that, on the first pick-and-place move, the second α component is assigned to head 1,
        the β component is assigned to head 2, and the first γ component is assigned to head
        3, and that these components are mounted in the order γ, α and β. Then, the robot
        arm moves successively between locations (5, 0), (10, 0), (15, 0), (15, 8), (10, 12) and
        (6, 5): a total distance of 5 + 5 + 8 + √
        41 + √
        65 = **.49. Suppose that on the second
        pick-and-place move, the first α component is assigned to head 1, and the second γ
        component is assigned to head 2, and that these components are mounted in the order
        α and γ. Starting at the location (6, 5) where the last component was mounted on the
        previous move, the robot arm moves successively between locations (5, 0), (15, 0), (10, 2)
        and (14, 16): a total distance of √
        26 + 10 + √
        29 + √
        212 = 35.04. These pick-and-place
        moves are illustrated in Figures 1a and 1b, respectively.
        Figure 1: (a) First pick and place move; (b) Second pick and place move (the solid line
        denotes the route travelled by the arm during this move)
        2
        3 Throughput
        It is required to maximize the throughput of the assembly line, which is determined by
        the machine with the heaviest workload. The workload of a machine is proportional to
        the total distance travelled by the robot arm. In computing this distance, you should
        assume that, when the conveyor moves, the robot arm remains at the position where the
        last component was placed until the new board arrives. Increased throughput is achieved
        by:
        • avoiding large movements of the robot arm;
        • balancing the workload between machines.
        The scheme that is selected should minimize the time required for the busiest machine
        to complete all of its mounting operations.
        4 Data
        Relevant data for the problem are as follows. There are three machines, and 102 components to be mounted on the board. The components are of 10 different types, which are
        labelled as type A, type B, etc., up to type J. There are nine pieces of equipment which
        are to be fitted on the heads, and no piece of equipment is duplicated. The following
        table lists the equipment, giving the component types that each piece of equipment can
        handle.
        Piece of equipment Types of components that can be mounted
        Figure 2 displays the feeder positions, and shows the positions of the component
        types on the board. The feeders for components of types A, . . . , J have coordinates (2,
        0), . . ., (11, 0), respectively. The board is depicted below the feeders. The components
        to be mounted at the top of the board have coordinates (1, 2), . . . , (12, 2), and the
        components to be mounted at the bottom of the board have coordinates (1, 13), . . . ,
        (12, 13). There are some locations on the board where no component is to be fitted.
        For example, no component is required at the position with coordinated (9, 5), while a
        component of type J is to be mounted at the position with coordinates (10, 5).
        Note that the times required to pick a component from a feeder, to mount a component on a board, and to move the board on the conveyor are neglibible.
        eeders
        Figure 2: Layout of the PCB board
        請加QQ:99515681  郵箱:99515681@qq.com   WX:codinghelp









         

        掃一掃在手機打開當前頁
      1. 上一篇:代做DTS204TC、代寫Java編程語言
      2. 下一篇:CSC4140代做、代寫Python/Java編程設計
      3. 無相關信息
        合肥生活資訊

        合肥圖文信息
        急尋熱仿真分析?代做熱仿真服務+熱設計優化
        急尋熱仿真分析?代做熱仿真服務+熱設計優化
        出評 開團工具
        出評 開團工具
        挖掘機濾芯提升發動機性能
        挖掘機濾芯提升發動機性能
        海信羅馬假日洗衣機亮相AWE  復古美學與現代科技完美結合
        海信羅馬假日洗衣機亮相AWE 復古美學與現代
        合肥機場巴士4號線
        合肥機場巴士4號線
        合肥機場巴士3號線
        合肥機場巴士3號線
        合肥機場巴士2號線
        合肥機場巴士2號線
        合肥機場巴士1號線
        合肥機場巴士1號線
      4. 短信驗證碼 酒店vi設計 deepseek 幣安下載 AI生圖 AI寫作 aippt AI生成PPT 阿里商辦

        關于我們 | 打賞支持 | 廣告服務 | 聯系我們 | 網站地圖 | 免責聲明 | 幫助中心 | 友情鏈接 |

        Copyright © 2025 hfw.cc Inc. All Rights Reserved. 合肥網 版權所有
        ICP備06013414號-3 公安備 42010502001045

        主站蜘蛛池模板: 亚洲av色香蕉一区二区三区蜜桃| 亚洲欧美日韩一区二区三区在线 | 乱精品一区字幕二区| 亚洲福利一区二区| 国产精品乱码一区二区三区 | 国产精品视频一区二区猎奇| 无码一区二区三区亚洲人妻| 日本高清成本人视频一区| 国产aⅴ一区二区| AV无码精品一区二区三区| 久久精品视频一区二区三区| 亚洲av无码天堂一区二区三区| 成人久久精品一区二区三区| 香蕉久久一区二区不卡无毒影院| 国产午夜精品一区二区| 免费人妻精品一区二区三区| 国产高清一区二区三区视频| 亚洲一区二区三区在线观看网站| 69福利视频一区二区| 少妇激情AV一区二区三区| 亚洲AV福利天堂一区二区三| 国产精品无码不卡一区二区三区| 国产丝袜无码一区二区视频| 国产av一区二区精品久久凹凸| 国产香蕉一区二区三区在线视频| 亚洲av无码片vr一区二区三区| 亚洲字幕AV一区二区三区四区| 韩国福利一区二区美女视频| 无码精品一区二区三区| 人妻在线无码一区二区三区| 成人一区二区三区视频在线观看| 在线电影一区二区| 精品国产亚洲一区二区三区在线观看 | 国产福利电影一区二区三区,亚洲国模精品一区 | 91无码人妻精品一区二区三区L| 亚洲一区中文字幕在线观看| 97se色综合一区二区二区| 国内精品视频一区二区三区八戒| 免费人妻精品一区二区三区| 中文字幕一区在线观看| 无码少妇一区二区|